Case Study > Large-scale distribution
New Interspar store
Castelfranco Veneto, Treviso
A comprehensive project with 4,000 square meters of built area and 14,000 square meters of urbanized area in which we are involved in all phases of the work: from site clearance, to the construction of the building, parking internal roads, the construction of a municipal road and the junction roundabout, as well as the electrical, mechanical and fire-fighting installations.
Client
Year
Status
Valore
Main Suppliers
Carron Cav. Angelo spa
2024
Concluded
4.350.000 €
Gruppo Grigolin
Bonato srl
Gruppo Industriale Tegolaia
Ferrari Giuseppe srl
Carra Depuzioni srl
Esse solai srl
Negropal srl
Client
Year
Status
Value
Main Suppliers
Carron Cav. Angelo spa
2024
Concluded
4.350.000 €
Gruppo Grigolin
Bonato srl
Gruppo Industriale Tegolaia
Ferrari Giuseppe srl
Carra Depuzioni srl
Esse solai srl
Negropal srl
With a total area of no less than 14,000 m2 and a built area of 4,000 m2, the Interspar in Castelfranco is one of the largest stores in its category.
For its construction, it was necessary to divide the project into several phases: An initial preliminary phase of land reclamation and preparation, followed by the insertion of piles and the first reinforced concrete structures, to the final phase of completing the work.
The Project in numbers
Smq
Smq
Smq
Hours
Site preparation
To accommodate the new store, some clearing and land preparation work was carried out:
The shrubs and vegetation previously present were removed to make room for the new shopping center, an important work that is part of a larger urban redevelopment project aimed at accompanying the growth and development of the area.
Once the area was cleaned up, the soil was prepared through the process of calcification: an intervention that takes advantage of the soil already on site, which is mixed with lime that acts as a binder, increasing its stability.
Laminating tanks
Nothing was left to chance: to ensure the safety of the site and avoid future hydrogeological problems, lamination tanks were installed underground.
A system of concrete basins about 2 meters deep, placed under the street level and connected to each other through a system of pipes, allows to collect rainwater which is channeled and drained safely.
Development
Technical choices such as this, made by Eleva Build and its team of engineers, made it possible to contain the already particularly tight time requirements by defining and optimizing the entire foundation and piling phase.
In addition, the lime preparation allowed the entire production chain on site: from the assembly of the prefabricated building to the realization of the urbanization and parking works, to operate in stable and clean conditions, non-stop even with the particularly adverse weather conditions that affected the city of Castelfranco throughout 2024.
Final result
The work started in March 2024 and was completed in October of the same year, allowing in the meantime the interior fit-out concluded with the inauguration and opening to the public on November 29, 2024 one month ahead of the contractual schedule entrusted to Eleva Build.
Eleva Build gained the recognition and trust of Principals and Designers by making winning technical choices. The results in terms of timing and final satisfaction of the main Client Aspiag Service srl crown a precise and punctual job order management.
Main Suppliers
All this was also possible thanks to the technical support of our suppliers, including:
Grigolin Group, Bonato srl, Tegolaia Industrial Group, Ferrari Giuseppe srl, Carra Depuzioni srl, Esse solai srl, Negropal srl.