Case Study > Special Projects
Retractable Glass Wall
Brera, Milano
360° project for the vertical disappearing glass wall of the Vesta restaurant: from the reconditioning of the metal structure, to the redesign and engineering of the new hydraulic automation system and remote control system.
Client
Year
Status
Value
Team
Generali spa
2023
Concluded
75.000€
1 Building site manager
1 Construction site manager
3 Workers
Client
Year
Status
Value
Team
Generali srl
2023
Concluded
75.000€
1 Building site manager
1 Construction site manager
3 Workers
Reconditioning and technological upgrade of a large glass wall (8300 mm wide by 3000 mm high) with a retractable self-closing system.
A project not only in terms of engineering but also of technology, to implement the functionality of the gate in terms of: speed of movement, durability of the mechanism over time, remote monitoring and assistance.
A project not only in terms of engineering but also of technology, to implement the functionality of the gate in terms of: speed of movement, durability of the mechanism over time, remote monitoring and assistance.
The structure
To give new life to this gate, it first had to be removed from its location to be reconditioned, upgraded and then repositioned. The metal structure, stripped of its glass panels, was entirely sandblasted and repainted, retaining its shape and colour.
The implementation
Once the structure had been reconditioned, the mechanical and electronic parts were replaced by inserting a remote control and remote assistance system with constant detection of the gate position, thanks to the use of absolute encoders. A hydraulic control unit, equipped with proportional solenoid valves, drives the movement of the cylinders, allowing them to slide vertically.
Particular attention has been paid to performance, in terms of lifting speed: in fact, thanks to the new system, it has been possible to considerably reduce the time from the previous 25 minutes to the current 2.5 minutes.
Particular attention has been paid to performance, in terms of lifting speed: in fact, thanks to the new system, it has been possible to considerably reduce the time from the previous 25 minutes to the current 2.5 minutes.
Print Format
PROJECT FILE
Related Case Studies
Large Surfaces
Torri di Madonna Bianca, Trento
2023
A work of over 8000 square metres of cladding with drywall panels.
Composite wood
finishes
Viale Ortles, Milano
2023
A new identity for the residential complex of Viale Ortles in Milan, thanks to the continuity of finishes that cover the façade.
Expansion of Sirp production lines
Cologna Veneta, Verona
2023
Construction of the steel foundation and mezzanine structure for the expansion of Sirp spa’s production lines.
Tagged BreraMilano